Demolition
Looking towards the interior of the house
Uneven joist, 1930s style
First piece of drywal on the first wall
That was a closet
Sliced the stairs off in prep for the wall
The ledge assembly
Partially built ledge
side view
studs to close off stairway
another view
now with drywall
and Roxul
on both sides
and drywall
second layer of roxul
the second wall stud assembly
installed second wall stud assembly
getting the rest of the second wall up
layers of drywall between the joists
from the furnace room
and where the duct is
and on the other side of the door
close up
PICT0001
installing the door
getting it level
done
PICT0006
Handel, I mean handle
from the hallway
BX, Roxul, QuietSeal, QuietGlue, etc.
ceiling with Roxul
old juction/light fixture box
close up, what a mess!
Refurbished
revised!
shrink wrap insulation
three lights, three switches
there be drywall on the ceiling
The "Pentagon" drywall lift (from China)
nine pieces lifted with the big red machine
PICT0011
making progress
Walls and celing gone
almost done with the ceiling
PICT0004
PICT0005
PICT0009
PICT0013
PICT0014
PICT0015
PICT0016
PICT0002
PICT0007
PICT0010
PICT0017
PICT0018
PICT0019
PICT0020